“
Damascus grew up mostly in the 1970s and 1980s. The neighborhoods that define this community Sweepstakes, Kings Valley, Magruder’s Discovery are full of large, well-kept homes on spacious lots. But the kitchens inside many of those homes are still wearing the original finishes: laminate countertops, dated cabinetry, layouts that made sense forty years ago but don’t work for how families actually live today.
When your Damascus home is carrying a median value north of $500,000, a kitchen stuck in 1983 isn’t just an aesthetic problem. It’s a gap between what your property is worth and what it actually reflects.
A kitchen renovation fixes that gap in a way that’s both visible and measurable. Minor kitchen remodels return 96 to 113 percent of their cost nationally, and in a high-value Montgomery County market like Damascus, a well-executed renovation directly adds to resale value while improving daily life in the meantime. You get better storage, a layout that actually flows, and surfaces that hold up not just a cosmetic refresh that looks good in photos for six months.
Damascus is also surrounded by the Montgomery County Agricultural Reserve 93,000 acres of protected farmland that limits new residential construction nearby. You’re not going to find a new-build home with a modern kitchen just down the road. The home you’re in is, in all likelihood, the home you’re going to be in for a long time. That makes investing in your kitchen one of the most practical decisions you can make.
Optima Design Group has been doing kitchen remodeling across Montgomery County and the broader DC metro area since 1973. That’s not a number pulled from a marketing brief it means we were actively working in this region before most of Damascus’s established subdivisions were even platted. Owner Gordon Franks started the business to pay his way through the University of Maryland and built it into a 50-plus year operation that has completed thousands of jobs across DC, Maryland, and Virginia.
Gordon is still personally involved in every project. He trains and background-checks every crew member, supervises the work, and writes the contracts himself. Consumers’ Checkbook the nonprofit, advertising-free consumer watchdog that DMV homeowners have trusted for decades has logged over 300 recommendations for Optima Design Group from real local clients. That kind of track record doesn’t happen by accident, and it doesn’t happen overnight.
If you’re in Damascus and you want a kitchen remodeler who knows Montgomery County permitting, knows the housing stock in this area, and has a verifiable history of delivering exactly what we quoted this is where that search ends.
It starts with an estimate. Gordon comes out, looks at your space, talks through what you want, and puts together a detailed, line-item proposal. Not a ballpark. Not a range with an asterisk. A specific number that reflects the actual scope of work and one that independent reviewers have specifically noted matches the final invoice when the job is done. That transparency is built into the process from day one, not bolted on at the end.
Once the scope is agreed on, the project moves into planning and permitting. Kitchen remodeling in Damascus falls under Montgomery County Department of Permitting Services jurisdiction. Any work that touches electrical, plumbing, or structural elements requires a permit, and we hold a General Contractor and Construction Manager license along with ten additional licenses to pull those permits properly. You won’t be left managing that paperwork yourself or wondering whether the work was done to code.
From there, the crew gets to work. Before any cabinet installation, countertop installation, or tile work begins, the surfaces are properly cleaned, scraped, and prepped. That prep is what determines whether a remodel holds up for twenty years or starts showing wear in five. The crew shows up every day until the job is finished not every other day, not when it’s convenient. When we give you a timeline, we keep it.
Ready to get started?
Kitchen remodeling in Damascus typically involves more than swapping out a countertop. The homes in this community are large a higher share of four- and five-plus bedroom homes than nearly anywhere else in the country and their kitchens reflect that scale. What often needs addressing is the full picture: cabinet replacement or kitchen cabinet refacing, new countertop installation, updated flooring, backsplash work, and sometimes electrical upgrades to support modern appliances that the original wiring wasn’t designed to handle.
We handle all of it. Kitchen cabinet installation, kitchen cabinet refacing, kitchen countertop installation, tiling, and hardwood flooring are all within scope managed by one contractor under one contract with one point of accountability. There’s no juggling separate trades, no gaps where one subcontractor’s work doesn’t line up with another’s, and no finger-pointing when something needs to be corrected.
For homeowners in Damascus who are weighing cabinet refacing against full replacement, the honest answer depends on the condition of your existing cabinet boxes. Refacing costs significantly less and can be completed in a matter of days, but if the boxes themselves are worn or the layout no longer works for your family, replacement gives you the opportunity to rethink the whole space. Gordon will tell you which makes sense for your kitchen not which one costs more.
It depends on what the project involves. Cosmetic work painting, replacing cabinet doors, swapping out a countertop in the same footprint generally doesn’t require a permit in Montgomery County. But if your kitchen remodeling project touches electrical wiring, plumbing lines, or any structural element, you’ll need to pull a permit through the Montgomery County Department of Permitting Services. That applies whether you’re upgrading to a new circuit for a range hood, moving a sink, or opening up a wall.
The important thing is making sure your contractor is actually licensed to pull those permits. In Maryland, any contractor doing permitted home improvement work is required to hold a Maryland Home Improvement Commission license. We hold that license along with a General Contractor and Construction Manager license and ten additional licenses. When permits are needed, we handle the process you don’t have to manage it yourself or worry about whether the work will pass inspection.
It depends on the scope. A focused kitchen cabinet refacing project where you’re keeping the existing cabinet boxes and replacing the doors, drawer fronts, and hardware can typically be completed in three to five days once installation begins. A more comprehensive kitchen renovation that includes new cabinet installation, countertop installation, flooring, and tile work generally runs longer, with full remodels taking anywhere from several weeks to a few months depending on material lead times and the complexity of the layout.
What matters more than the number of days is whether your contractor actually sticks to the timeline they give you. Our Damascus clients have specifically noted in independent reviews that the project finished exactly when they were told it would one reviewer put it plainly: “They told me four days and it took them four days.” If you’re a homeowner with a full schedule, that kind of reliability isn’t a small thing. It’s the difference between a manageable project and a months-long disruption.
Cabinet refacing means keeping the existing cabinet boxes in place and replacing the visible surfaces the doors, drawer fronts, and hardware along with applying a veneer to the cabinet frames. It costs significantly less than full replacement and makes sense when the cabinet boxes themselves are structurally sound and the layout of your kitchen works for how you use the space. Turnaround is fast, and the visual result can be dramatic.
Full cabinet replacement means removing everything and starting from scratch. It costs more and takes longer, but it gives you the opportunity to change the layout entirely move cabinets, add an island, reconfigure storage, or address a floor plan that simply doesn’t function well. In Damascus homes built in the 1970s and 1980s, the original kitchen layouts often reflect design thinking from a different era: limited counter space, closed-off floor plans, and storage that doesn’t match how modern families cook and gather. If the layout itself is the problem, refacing won’t fix it. Replacement will. The right answer depends on your specific kitchen, and it’s worth having an honest conversation about both options before committing to either.
It should and with us, that’s not just an expectation, it’s something our clients have specifically called out in independent reviews. Multiple reviewers on Washington D.C. Consumers’ Checkbook have noted that the final invoice matched the original estimate exactly. That’s not a common thing in this industry. Nearly 40 percent of homeowners nationally exceed their remodeling budget, often because the original quote was vague, incomplete, or didn’t account for conditions discovered mid-project.
Our process starts with a detailed, line-item proposal that reflects the actual scope of work. If something changes during the project a condition that wasn’t visible before demolition, a material substitution, a scope addition you request that gets documented in writing before any additional work proceeds. You’re not going to get a surprise invoice at the end. Damascus homeowners are high-earning professionals who made careful decisions about where to live and how to invest in their homes. The estimate you get from us is the number you can plan around.
In most cases, yes particularly for a minor to mid-range kitchen renovation. Minor kitchen remodels return between 96 and 113 percent of their cost nationally, and Damascus homes are carrying median values well above $500,000. A kitchen that looks dated or worn relative to the rest of the home is one of the first things buyers notice, and 54 percent of realtors surveyed recommend upgrading the kitchen before listing.
The caveat is scope. A targeted renovation new cabinet installation, updated countertops, fresh flooring typically delivers a strong return. A full gut remodel with premium custom everything tends to return a smaller percentage of its cost at resale, though it significantly improves daily quality of life while you’re still in the home. Given that Damascus is surrounded by the Agricultural Reserve and new construction nearby is limited, many homeowners here aren’t planning to sell anytime soon. In that case, the return on investment is less about the sale price and more about the years of daily use you get from a kitchen that actually works for your family.
This is a reasonable thing to want to know before you hand over access to your home. Damascus is a community where residents chose to live specifically because of the character and privacy it offers it’s not a place where homeowners are indifferent to who’s coming through their door.
Optima Design Group owner Gordon Franks personally background-checks every crew member before they work on a client’s property. He also personally trains and supervises every person on the team. This isn’t a franchise operation where a salesperson takes your deposit and hands the job off to a crew you’ve never met. Gordon is accountable for the work, and the people doing the work are accountable to him. That direct line of accountability from the person you spoke with to the crew in your home is part of why we’ve maintained over 300 recommendations on Washington D.C. Consumers’ Checkbook across more than fifty years of working in Montgomery County and the broader DMV area. You can verify that track record independently, without taking anyone’s word for it.
Other Services we provide in Damascus